Subdivision site data
A subdivision site data report brings the water, sewer and stormwater data together with flood, levels, the catchment, design rainfall and transport for a Brisbane lot that may be subdivided.
Like every RADDLabs report, it provides data, not advice. Its first page says so, and every section ends with what a licensed professional confirms before anyone relies on it.
A sample: 200 Lancaster Road, Ascot
Section titled “A sample: 200 Lancaster Road, Ascot”This is the full version, 19 pages on A4, exactly as the engine produced it. Nothing in it was edited by hand.
- Download the PDF (4.7 MB)
Select a page to open it at full size.
Sections
Section titled “Sections”| Section | What it holds |
|---|---|
| Site identification | The parcel: lot and plan, area, tenure and local government area, with a locality map |
| Summary of observations | Every observation the data supports, in one list, each with its source marker |
| Water and sewer networks | Water and sewer mains near the site, with a sewer map and a table of servicing items |
| Stormwater network | The council’s stormwater pipes near the site, existing and planned |
| Levels and landform | LiDAR ground levels, a site levels grid, an elevation map and the upstream catchment that drains to the site |
| Flood and waterway data | Flood awareness categories, flood and waterway overlays, and a flood map |
| Transport and access | The trunk roads, bikeways and public transport mapped near the site |
| Power and telecommunications | A note on where these assets are found: a Before You Dig Australia enquiry |
| Design rainfall | The Bureau of Meteorology’s 2016 design rainfall intensities for the site’s grid cell, 5 minutes to 24 hours at 63.2% to 1% AEP |
| Published rules set against the site’s data | Each published rule, its threshold, the site’s value from a tool and how the two compare |
| Items for a licensed professional | Every item marked “For a licensed professional to confirm”, in one list |
| Appendix: Sources and licences | Each numbered source with its licence and disclaimer |
What a licensed professional confirms
Section titled “What a licensed professional confirms”The report ends with these items, each marked “For a licensed professional to confirm”:
- Every table and observation in this report, against current records
- Water and sewer demand for the proposed lots, and the network’s capacity, which only Urban Utilities can confirm
- Water pressure and fire flow at the site
- The approved connection points, and any upgrade the utility requires
- Stormwater quality, detention and the lawful point of discharge
- The proposed lot layout, the drainage layout and their levels
- Traffic and access
- Erosion and sediment control during construction
- Before You Dig Australia results, with services located on site
Ask for one
Section titled “Ask for one”Write the subdivision site data for 200 Lancaster Road, Ascot.See Ask for a report for the questions you are asked and how to read the result.
Where the data comes from
Section titled “Where the data comes from”The parcel comes from the state cadastre, zoning, overlays and the stormwater network from Brisbane City Plan 2014, flood categories from the council’s flood awareness data, the water and sewer networks from Urban Utilities, ground levels and the catchment from the state’s LiDAR elevation data, design rainfall from the Bureau of Meteorology, and the imagery from Google. See Data sources.




