Stormwater data report
A stormwater data report gathers the data a stormwater management plan starts from: the council’s stormwater network near the site, flood and waterway overlays, ground levels, the catchment that drains to the site, design rainfall, and the published rules a site’s area can be set against.
Like every RADDLabs report, it provides data, not advice. Its first page says so, and every section ends with what a licensed professional confirms before anyone relies on it.
A sample: Suite 1, 40 Castlemaine Street, Milton
Section titled “A sample: Suite 1, 40 Castlemaine Street, Milton”This is the full version, 20 pages on A4, exactly as the engine produced it. Nothing in it was edited by hand.
- Download the PDF (3.9 MB)





Select a page to open it at full size.
Sections
Section titled “Sections”| Section | What it holds |
|---|---|
| Summary of observations | Every observation the data supports, in one list, each with its source marker |
| Site identification | The parcel: lot and plan, area, tenure and local government area, with a locality map |
| Existing stormwater network | The council’s stormwater pipes near the site, existing and planned |
| Flood and waterway data | Flood awareness categories, flood and waterway overlays, and a flood map |
| Levels and landform | LiDAR ground levels, a site levels grid, an elevation map and the upstream catchment that drains to the site |
| Design rainfall | The Bureau of Meteorology’s 2016 design rainfall intensities for the site’s grid cell, 5 minutes to 24 hours at 63.2% to 1% AEP |
| Published rules set against the site’s data | Each published rule, its threshold, the site’s value from a tool and how the two compare |
| Stormwater quality and quantity | Left for a licensed professional: no open data answers it |
| Items for a licensed professional | Every item marked “For a licensed professional to confirm”, in one list |
| Appendix: Sources and licences | Each numbered source with its licence and disclaimer |
What a licensed professional confirms
Section titled “What a licensed professional confirms”The report ends with these items, each marked “For a licensed professional to confirm”:
- Every table and observation in this report, against current records
- Stormwater quality modelling against the council’s load reduction targets
- Detention, with the peak flows before and after the development
- The lawful point of discharge, and any easement it needs
- The contributing catchment areas and a catchment plan
- The proposed drainage layout and its levels
- Erosion and sediment control during construction
- Capacity of the downstream network, which only the council can confirm
Ask for one
Section titled “Ask for one”Write a stormwater data report for Suite 1, 40 Castlemaine Street, Milton.See Ask for a report for the questions you are asked and how to read the result.
Where the data comes from
Section titled “Where the data comes from”The parcel comes from the state cadastre, zoning, overlays and the stormwater network from Brisbane City Plan 2014, flood categories from the council’s flood awareness data, ground levels and the catchment from the state’s LiDAR elevation data, design rainfall from the Bureau of Meteorology, and the imagery from Google. See Data sources.