# Site data report

> What a site data report holds, section by section, with pages from a sample for a Brisbane site.

> The index of this manual is [llms.txt](https://raddlabs.com/mcp/manual/llms.txt).

A site data report gathers the open data for a Brisbane site in one place: the parcel, its zoning and overlays, flood categories, ground levels and the catchment that drains to it, design rainfall, the water, sewer and stormwater networks near it, and a photo of the frontage. Every table and observation cites its source, and the report says what a licensed professional must confirm.

Like every RADDLabs report, it provides data, not advice. Its first page says so, and every section ends with what a licensed professional confirms before anyone relies on it.

## A sample: 1 Eagle Street, Brisbane City

This is the developer version, 22 pages on A4, exactly as the engine produced it. Nothing in it was edited by hand.

* [Download the PDF](https://raddlabs.com/mcp/manual/reports/eagle-street/developer.pdf) (3.8 MB)
* [Download the Word file](https://raddlabs.com/mcp/manual/reports/eagle-street/developer.docx) (5.2 MB)

[![The cover, with the notice that the report gives data, not advice](https://raddlabs.com/mcp/manual/reports/eagle-street/developer-page-01.webp)](https://raddlabs.com/mcp/manual/reports/eagle-street/developer-page-01.webp)

Cover

[![Summary of observations](https://raddlabs.com/mcp/manual/reports/eagle-street/developer-page-04.webp)](https://raddlabs.com/mcp/manual/reports/eagle-street/developer-page-04.webp)

Summary of observations

[![Upstream catchment](https://raddlabs.com/mcp/manual/reports/eagle-street/developer-page-08.webp)](https://raddlabs.com/mcp/manual/reports/eagle-street/developer-page-08.webp)

Upstream catchment

[![Design rainfall](https://raddlabs.com/mcp/manual/reports/eagle-street/developer-page-16.webp)](https://raddlabs.com/mcp/manual/reports/eagle-street/developer-page-16.webp)

Design rainfall

[![Published rules set against the site's data](https://raddlabs.com/mcp/manual/reports/eagle-street/developer-page-18.webp)](https://raddlabs.com/mcp/manual/reports/eagle-street/developer-page-18.webp)

Published rules set against the site's data

Select a page to open it at full size.

## Sections

| Section                                     | What it holds                                                                                                                                                                                         |
| ------------------------------------------- | ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- |
| Site identification                         | The parcel: lot and plan, area, tenure and local government area, with a locality map                                                                                                                 |
| Zoning and planning overlays                | The zone and every planning scheme overlay mapped on the site, as tables, with a planning map                                                                                                         |
| Flood data                                  | The council’s flood awareness category for each flood type and the flood overlay areas, with the council’s disclaimer                                                                                 |
| Ground levels and soils                     | LiDAR ground levels (lowest, highest and mean, in m AHD), an elevation map, the acid sulfate soils overlay, and the upstream catchment: the hectares that drain to the site on the LiDAR ground model |
| Water supply network                        | Water mains near the site: asset ID, material, diameter and status                                                                                                                                    |
| Fire hydrants                               | Hydrants near the site, from the utility’s open data                                                                                                                                                  |
| Sewer network                               | Sewer mains and manholes near the site: asset ID, material and diameter                                                                                                                               |
| Stormwater network                          | The council’s stormwater pipes near the site, existing and planned                                                                                                                                    |
| Transport and the frontage                  | A street photo of the frontage and the trunk roads, bikeways and public transport mapped nearby                                                                                                       |
| Power and telecommunications                | A note on where these assets are found: a Before You Dig Australia enquiry                                                                                                                            |
| Design rainfall                             | The Bureau of Meteorology’s 2016 design rainfall intensities for the site’s grid cell, 5 minutes to 24 hours at 63.2% to 1% AEP                                                                       |
| Summary of observations                     | Every observation the data supports, in one list, each with its source marker                                                                                                                         |
| Published rules set against the site’s data | Each published rule, its threshold, the site’s value from a tool and how the two compare                                                                                                              |
| Items for a licensed professional           | Every item marked “For a licensed professional to confirm”, in one list                                                                                                                               |
| Appendix: Sources and licences              | Each numbered source with its licence and disclaimer                                                                                                                                                  |

## What a licensed professional confirms

The report ends with these items, each marked “For a licensed professional to confirm”:

* Every table and observation in this report, against current records
* Water and sewer connection points, sizes and network capacity, with Urban Utilities
* The lawful point of discharge for stormwater, and whether detention or treatment applies
* Flood levels and any minimum floor level for the proposed use
* Levels, earthworks and retaining, from a site survey
* Before You Dig Australia results, with services located on site
* Any design, cost or approval matter

## Ask for one

```text
Write a site data report for 1 Eagle Street, Brisbane City.
```

See [Ask for a report](https://raddlabs.com/mcp/manual/reports/ask-for-a-report/) for the questions you are asked and how to read the result.

## Where the data comes from

The parcel comes from the state cadastre, zoning and overlays from Brisbane City Plan 2014, flood categories from the council’s flood awareness data, ground levels and the catchment from the state’s LiDAR elevation data, design rainfall from the Bureau of Meteorology, the water and sewer networks from Urban Utilities, and the aerial and street imagery from Google. See [Data sources](https://raddlabs.com/mcp/manual/data-sources/).
